Maldives prefabricated building steel structure warehouse steel shed

Two floors steel structure storage shed  building can use for warehouse and workshop, the live load and dead load can follow client\'s requirements to design and calculate .For this project,the flooring is grouped by flooring steel beam & purlin &checker steel plate . We supply free service for trainning installatio

Featured Products

Two floors steel structure storage shed  building can use for warehouse and workshop, the live load and dead load can follow client's requirements to design and calculate .For this project,the flooring is grouped by flooring steel beam & purlin &checker steel plate . We supply free service for trainning installation at China, and in order to satisfy clients' requirements for fast instalation,we can send engineer to project site for guide installation . 
Maldives Prefabricated Building Steel Structure Warehouse Steel Storage ShedMaldives Prefabricated Building Steel Structure Warehouse Steel Storage ShedMaldives Prefabricated Building Steel Structure Warehouse Steel Storage Shed
Steel structure building is one kind of prefabricated house, both the whole steel frame and cladding materials are all finish fabrication,including cutting,drilling,shaping,assembly ,welding, resist rust,painting and packing .All steel members connected by bolt or screw or pin ,etc. Fast installation and environmental .


Steel warehouse building is one kind of steel structure. Steel structure project is the third generation construction. It combines H section and c/z section into the frame with the profiled steel sheet or sandwich panel as the wal and roof. The traditional reinforced concrete construction has aready been taken place by this kind of construction in developed contries. It has many excellent charateristics such as light weight, larger span, less marerial, low cost, less foundation, short building cycle, safe, beautiful, ect. It is widely used in single industrial factory, warehouse, business construction, office, parking lots, residence, multi-layered high building and so on.

STEEL STRUCTURE MEMBERS PRODUCTION (Fabrication) PROCESS :

1. Prepair raw materials : cut steel plate or use internation size H section steel and angle steel,round tube,round steel,square tube etc.;

2. Assembly and welding: our welders will follow the drawings to assembe the steel members and weld them together as a entire beam/column/brace and so on; (Our quality inspector will check the steel pieces after finish welding,this is the first quality check)

3. Sand blast : After finish welding and polishiing,our sand blast effect can reach internation 2.5 high grade,very good for resist rust; (Secondary quality check)

4.Paint : Within 2 hours after sand blast,all the steel members should be paint. Client can choose any color and any brand of paint. (The third quality check)

5. Inspect the goods by client : After we finish a part of fabrication work,we will invite clients to check the goods before we pack the steel frame.

6.Packing and loading : If clients require us to load the goods by close containers,we will pack the steel structure members one by one on the steel skid and tie the whole steel package well. (The fourth quality check )


Please check the details drawings as follow :

Maldives Prefabricated Building Steel Structure Warehouse Steel Storage Shed
Our strong points(advantages) :

1.  Sand blast:  The sand blast effect reach 2.5 high grade,many countries with high standard requirements accept 2.5 grade.

2.  Welding:        Our welders are full of experiences,professional in butt weld,fillet weld,intermittent welding etc.The welding lines are straight,orderly and nice.

3.  Painting:       We use hight pressure airless spraying machine for painting,both the color and the thickness of paint are well-proportioned.

4.  Packing:  (1)  Open top container(advantage:easy to load the steel;disadvantage:high shipping cost,aleak and few quantity);
                        (2)  Closed container with steel skid (advantage:save shipping cost,all members be packed together and reduce friction,the surface of steel members will be much better;save labor cost to unload the steel members).

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours